Customization: | Available |
---|---|
Workplace: | Construction/Factory/Coal, Engineering |
Style: | Trousers |
Still deciding? Get samples of US$ 60/piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material: Cotton/Polyester/Twill/CVC/TC
Feature: High quality/comparable price/punctual delivery
LOGO: Offer making logo
MOQ: 300pcs
Packaging: Each one in a polybag, several units in a carton.
Delivery time: Within 30-45 days after deposit and samples confirmed.
Product Description:
Features:
|
knee patches (with kneepad access) Can be made with reflective tape |
*Function: | Workwear, driving trousers, painter trousers, work pants, industry trousers, workshop pants, ect |
Model: | Construction Work Pants |
*Shell fabric: |
Multichoices as following Option 1: TC, 65% polyester, 35% cotton, Twill, 195GSM, 21x21/108x58 Option 2: TC, 80% polyester, 35% cotton, twill, 190GSM, 21x21/108x58 Option 3: TC, 65% polyester, 35% cotton, plain, 165GSM, 23x23/88x64 Option 4: 100% cotton, twill, 180GSM, 21x21/108x58 Option 5: 100% cotton, plain, 185GSM, 20x20/100x55 Option 6: 100% cotton, twill, 270GSM, 16x12/108x56 We could arrange the fabric colour lab dips according to client requirments |
* BUTTON | Seven concealled poppers on center front |
Pockets: |
6 pokets including: 2 x side pockets 2 thigh pockets combat style with flaps and fastenings 2 patch pockets on back with flaps and fastenings 2 knee patches (with kneepad access)
|
Trims: |
5# nylon zipper on center front
Dye to match on pocket flap
28L dye to match button on CF
|
Size |
26"-56"
|
Packing Details |
1pcs work pants /polybag 20pcs / carton Carton size 26"-34" 31x44x34cm 36"- 46" 31x44x36cm 48"-56" 31x44x38cm 20" container could load 10500pcs 40" container could load 22800pcs 40" HQ could load 25000pcs |
Trade Terms | FOB,CIF |
Loading Port | Shenzhen( or other ports after negotiated) |
Terms Of Payment | T/T (30% deposit,70% against the copy of the B/L), L/C, WESTERN UNION. |
MOQ | 300PCS |
Sample Time | 5-15 days |
Delivery Time | 30-45 days after order confirmed |
Supply Ability | 30000 pcs/ month |
Our Vantage |
more than 7 years experience skilled workers and technical personnel |
FAQ: